| Date |
2019-12-30 19:31:00 |
| Vessel Name |
Brahminy Kite |
| Shift |
Night |
| Check engines and Gearboxes |
checked |
Check Bilges and Fluids |
Checked |
| Check Bilge alarms are functioning |
Checked |
Check batteries are on |
Checked |
| Check fluid levels |
Checked |
Check watertight doors are secure |
Checked |
| Close and Secure deck hatches |
Checked |
Check Toilets |
Checked |
| Check Gensets are online |
Online |
Check Notice to Mariners |
Checked |
|
|
|
| Close schedule is current and onboard |
Checked |
Check Navigation Lights |
Checked |
| Close latest weather reports |
|
Check Tidal Information |
Checked |
| Check Shipping Notices for the day |
Checked |
Check Steering |
|
| Radios on and on correct channel |
Checked |
Check Engine Controls |
Checked |
| Turn on Plotter Radar and sounder |
|
Check safety message ready to play |
Checked |
| Check Log Book for defects |
Checked |
Check Air-Conditioners are functinal |
Checked |
| Tool box talk has been completed |
Checked |
Check CCTV is on and Recording |
Checked |
| Check Bilge Pumps are operating correctly, main engine and jet rooms |
Checked |
Check Fire control pannel alarms |
Checked |
| Check anchor control and winch control |
Checked |
Check backup steering and control systems including clutch controls |
Checked |
| Check primary steering |
Checked |
Check Chart Portfolio |
Checked |
| Check compass deviation card |
Checked |
Stability-Draft Marks |
Checked |
| All instrument panel and repeater lights are burning brightly |
Checked |
Ensure that the engine room fans are running |
Checked |
Comments
Hot handover at fish landing and departed to along for agent transfer. Pre start checks completed while waiting for agent to board vessel. Gen set inspected but fluid dips to be conducted before next start up
|